Project Overview A large paper mill in Shandong, China, decided to upgrade the equipment in its production plant in order to improve productivity and safety. The mill mainly produces various types of paper and cardboard, which require frequent handling of raw materials as well as heavy equipment components during the production process. Due to the low efficiency of the old handling equipment, the mill decided to introduce a 10-ton overhead crane to improve the automation and safety of material handling. Project Challenges Space Constraints: The height of the paper mill workshop is limited, and overhead crane installation needs to be adapted to the site layout. Dust And Moisture Requirements: The High humidity and dusty environment in paper mills, cranes need to have anti-corrosion and dustproof functions. Precise Handling Requirements: The handling process needs to be smooth without shaking, to avoid damaging the product quality. Efficient Operation Requirements: The fast pace of the production line, cranes to meet the high frequency of use while reducing the failure rate to ensure continuous production. VOITTO Solution To meet the stringent requirements of this project, Voitto…
Project Overview Due to the complex geological conditions and narrow construction space, the Xi’an Metro Tunnel Construction Project requires the lifting of large pipe segments and heavy equipment in the shaft. Traditional truck cranes cannot meet the lifting needs in a small space, and the operation in the tunnel requires extremely high safety and precision. For this reason, the construction party decided to purchase a 50-ton gantry crane as the core lifting equipment, responsible for the assembly of pipe segments, the lifting of shield machine components, and the vertical transportation of construction materials. Project Challenges Space Limitation: The shaft size is only 15m×10m, and the gantry crane needs to complete large-tonnage lifting in a limited space while avoiding interference with surrounding structures. Load Safety: The maximum single lifting load of the shield machine cutterhead assembly is 48 tons, and the stability of the crane under full load must be ensured. Environmental Risks: The humidity and dust in the tunnel are high, and the electrical system and steel structure must be moisture-proof and corrosion-resistant. Schedule Pressure: The project requires the crane…
Project Overview A well-known automobile manufacturing plant in the United States needs to frequently move large stamping dies for the production of body parts. The dies weigh up to 30 tons, are large in size, and require high-precision positioning to ensure smooth operation of the production line. In order to optimize the production process, the factory decided to introduce an overhead crane to improve the efficiency and safety of mold handling. Project Challenges The Mold Is Heavy: A 30-ton mold requires an overhead crane with extremely high stability and load capacity. Space Limitation: The height of the factory workshop is limited, and it is necessary to ensure that the crane can operate flexibly in the limited space. Precision Positioning Requirements: Mold installation requires millimeter-level accuracy to avoid collision or misalignment affecting production. Safety And Compliance: It is necessary to comply with the US OSHA (Occupational Safety and Health Administration) standards to ensure safe operation. Production Efficiency: The original handling method takes a long time, and it is necessary to shorten the mold replacement time and reduce downtime losses. VOITTO Solution Customized Overhead Crane: A double-girder…