VOITTO Crane supplied a customized 20 ton gantry crane to a steel fabrication yard in Dubai, UAE. This crane is specifically designed for outdoor operations, with a span of 25 meters and a lifting height of 9 meters. It is equipped with both a cab control system and a remote control system, allowing users to operate the equipment to perform material handling tasks in open-air stockpiles and manufacturing areas. Project Background In March, a Dubai-based steel fabrication company contacted us to purchase a 20-ton gantry crane for handling heavy steel plates, structural beams, and structural components in open-air storage yards and fabrication areas. This customer’s manufacturing facility processes structural steel components, requiring frequent movement of materials between the raw material yard, the cutting and welding stations, and the finished goods shipping area. Before the implementation of this project, the facility primarily relied on mobile cranes and forklifts to perform lifting operations, which not only limited production throughput but also caused scheduling delays during peak production periods. As the volume of customer orders increased, management recognized the need for a dedicated…
Project Background VOITTO Crane has delivered a 16/5-ton double girder overhead crane to a steel structure manufacturing company in Algeria. This customer operates a large-scale workshop specializing in the processing and manufacturing of steel plates, steel coils, and prefabricated steel structural components. These materials are not only extremely heavy and bulky but also place extremely high demands on lifting equipment. With increasing production volumes and increasingly tight delivery schedules, the workshop’s existing material handling methods—which relied on manual labor and forklifts—could no longer keep pace with production demands. The customer sought a double girder overhead crane solution capable of serving multiple workstations simultaneously, featuring both a 16-ton main hoist and a 5-ton auxiliary hook for light-duty lifting, while also accommodating the structural constraints of the existing factory span. After evaluating several crane manufacturers, the customer chose VOITTO Crane, primarily due to our track record in export projects, our technical responsiveness, and our highly competitive range of CE-certified products. Project Challenges Exporting a heavy-duty industrial double girder overhead crane to Algeria involves complex challenges across various areas, including engineering, regulatory compliance,…
Project Background In January 2026, VOITTO Crane received an email inquiry regarding a 20 ton overhead bridge crane. The client operates a large-scale warehousing and industrial park facility in Egypt, serving as a critical hub for heavy material handling, transportation, and circulation across multiple production and storage zones. Day-to-day operations involve the constant loading, unloading, and repositioning of heavy industrial goods — work that demands powerful, reliable, and precise lifting equipment. As the facility’s operational capacity expanded, the client identified a significant bottleneck: production throughput was limited due to a lack of dedicated overhead cranes, which increased the risks associated with manual handling and reduced overall on-site efficiency. After evaluating existing suppliers in the market, the client reached out to VOITTO. What attracted them was VOITTO’s proven track record in providing heavy-duty crane solutions for export markets. Project Challenges After receiving an inquiry via email from the client, we promptly reached out to them. We then held a video conference to discuss their operational conditions and lifting requirements. Following our discussions and after gaining a clear understanding of their needs,…
Project Background Our client is a mechanical repair service company based in Mongolia. They specialize in providing comprehensive repair and maintenance services for mining machinery—including excavators, drilling rigs, loaders, and mineral processing equipment. With the continued expansion of Mongolia’s mining industry, the facility faces immense pressure during major overhaul operations due to the challenge of handling increasingly massive and heavy components. In January 2026, the factory’s management decided to purchase single girder overhead traveling crane to upgrade their workshop lifting equipment. After evaluating several suppliers, they ultimately chose VOITTO. The key factors that attracted them included our specialized solutions in crane engineering, our transparent customization process, and our extensive export experience in regions with extreme climates. Project Challenges Upon receiving the client’s email, we promptly established contact and communicated via video conference. During our discussions, we gained a detailed understanding of the client’s operating conditions and lifting requirements. Concurrently, VOITTO Crane faced the following project challenges. Extreme Cold Weather Conditions: Winters in Mongolia are harsh, with temperatures often plummeting to below -30°C. We must design our equipment—including motors, brakes, electrical…
A large-scale heavy-duty manufacturing factory in Mexico needed to upgrade its overhead material handling system to support rapidly growing production demands. With expanding output and frequent transfer of raw materials, heavy components, and semi-finished goods across multiple workshop bays, the plant required a reliable, efficient, and safe lifting solution capable of continuous operation in a harsh industrial environment. After careful evaluation, the client selected a batch of high-performance electric chain hoist from Voitto Crane, choosing robust models specifically designed for demanding industrial chain hoist applications. Project Overview The factory operates in a high-volume production setting where precise and repeated lifting is essential for maintaining workflow efficiency. Loads varied in shape and weight, often reaching several tons, requiring equipment that could integrate seamlessly with existing overhead crane systems and monorail tracks. The decision focused on heavy duty chain hoist units known for their durability, compact design, and suitability for factory environments. This project involved deploying multiple electric hoist chain units to cover several production lines, ensuring smooth material flow without bottlenecks. Project Challenges Solution: Heavy-Duty Electric Chain Hoist Deployment The supplier…
Project Overview A mid-sized industrial components manufacturer in Johor, Malaysia needed to replace an aging fleet of manual chain hoists that could no longer support its expanding production schedule. With two active production lines moving steel sub-assemblies weighing between 360 kg and 1,800 kg at a rate of more than 80 lifts per day, the facility required a reliable, compliant, and immediately scalable electric hoist chain solution. After a full workstation load assessment, the client placed an order for 6 units of heavy duty electric chain hoist equipment across four capacity classes — deployed simultaneously across primary production lines, sub-assembly stations, and a quality control inspection bay. All units were configured as part of an electric chain hoist crane system integrated with existing runway beams and motorized trolleys on-site. Project Challenges Varying Load Profiles Across Workstations: The two primary production lines required heavy duty chain hoist units rated up to 1,500 kg, while sub-assembly and QC stations demanded lighter, more precise lifts in the 250–500 kg range. A single-capacity industrial chain hoist specification would either underserve the primary lines or…
Project Overview A well-established industrial maintenance company based in Almaty, Kazakhstan, was looking for a reliable and flexible lifting solution for their equipment repair workshop. Their technicians regularly handle heavy machine components, engine assemblies, and steel parts weighing up to 1.5 tons during routine maintenance operations. After evaluating multiple options, the client chose our 2 ton aluminum gantry crane — a lightweight yet robust portable solution specifically designed for indoor workshop environments. The crane was customized to meet their operational requirements and successfully delivered to Kazakhstan as part of our ongoing export program to Central Asia. Customer Requirements The client came to us with a clear set of needs: Project Challenges Our Solution: 2 Ton Portable Aluminum Gantry Crane After a detailed assessment of the client’s workshop layout, workflow, and lifting frequency, we configured and supplied the following solution: Technical Specifications Parameter Specification Lifting Capacity 2 Ton (2,000 kg) Span 3 meters (adjustable) Height Under Beam 2.5 m – 4.5 m (adjustable) Frame Material 6061-T6 Aluminum Alloy Hoist Type Electric Chain Hoist Lifting Speed 3 m/min (variable) Self Weight ~80…
Project Overview A large-scale manufacturing plant in Ecuador needed to upgrade its production line material handling system across multiple workshop bays. With a growing production capacity and increasing demand for efficient raw material and semi-finished goods transfer between workstations, the factory sought a reliable and cost-effective lifting solution. After thorough evaluation, the client partnered with VOITTO and placed an order for 10 units of 5-ton wire rope electric hoists to be deployed simultaneously across its facilities. Project Challenges Multiple-Point Deployment: The factory required 10 hoists to be installed and commissioned across different workshop sections at the same time, demanding strict consistency in product quality and performance. Harsh Operating Environment: The workshop environment involves dust, humidity, and continuous operation shifts, requiring equipment with high durability and resistance to wear. Load Variety: Materials transferred along the production line vary in shape and weight, requiring the hoists to handle loads stably up to the rated 5-ton capacity without performance degradation. After-Sales & Technical Support: As an overseas client, the factory required comprehensive documentation, remote technical guidance, and readily available spare parts to minimize…
Project Background Recently, we received an inquiry for a 1 ton jib crane. The client is from the United Arab Emirates and operates a company that provides parts assembly and equipment maintenance services for the oil and gas, construction engineering, and industrial equipment industries. The client’s workshop has multiple fixed assembly and maintenance workstations. The main tasks include the installation, disassembly, and routine maintenance of motors, pump sets, valve components, and mechanical transmission parts, with individual material weights typically ranging from 300 kg to 1,000 kg. To improve operational efficiency and comply with local industrial safety and standardization requirements in the UAE, the customer decided to equip their fixed workstations with dedicated lifting equipment. After comparing overhead cranes, mobile lifting equipment, and jib cranes, the customer ultimately chose a 1-ton column-mounted jib crane and purchased three units at once. Customer Requirements During the initial project communication, the client outlined their requirements: VOITTO’s Solutions After our technical staff learned about their working environment, daily usage frequency, and the required coverage area of the equipment, our technical staff quickly developed the following…
Project Background In September 2025, VOITTO Crane received an email inquiring about 2 ton portable gantry crane. This client is from Mexico and operates a small parts manufacturing factory, primarily involved in the processing and assembly of metal parts. With the increasing number of orders from the client’s factory, the existing simple lifting equipment could no longer meet production requirements. The client decided to invest in a lifting solution that low-cost, flexible, and did not require complex civil engineering modifications for lifting and transporting molds and heavy components within the workshop. Project Challenges We communicated with our clients to understand their working environment and usage requirements. Therefore, we will face numerous challenges: VOITTO Solutions Based on customer requirements, we have customized a 2 ton portable gantry crane solution. Key features and advantages include: Modular Structural Design: The entire equipment adopts a detachable structure, facilitating transportation, installation, and future relocation. Lightweight Design: Reduces self-weight while ensuring the rated lifting capacity. Universal Casters and Braking System: Allows users to freely move the equipment and lock it in place during operation. Lifting Mechanism:…
Project Background Recently, we received an inquiry from a South African customer about a European electric hoist. The client operates a medium-sized steel structure and metal processing manufacturing enterprise, mainly processing steel beams, steel plates, and welded parts. With the growth of business volume, the original lifting mechanism has experienced problems such as high operating noise, large impact, high maintenance costs, and insufficient operating efficiency, and can no longer meet the needs of their high-frequency production. To improve production efficiency and safety in their workshop, the client decided to upgrade the equipment and opted to purchase European electric hoist. Customer Needs Analysis After establishing contact with the client, we learned about the following needs: After understanding the customer’s needs and Parameter information, the VOITTO technical team quickly developed a solution. European Electric Hoist Specification VOITTO Cranes provides a set of efficient, safe, energy-saving, and internationally compliant solutions based on the actual working conditions and needs of its customers. Project Execution After the equipment is manufactured, it is shipped to South Africa by sea. Considering the possibility of bumps during transportation,…
Project Overview In July 2024, Voitto received an equipment procurement email from Brazil a steel structure manufacturer. The customer had an outdoor material yard primarily used for storing steel structures, components, and finished products. They planned to purchase a 10 ton gantry crane for lifting and stacking steel structure materials. After initial communication with the customer and understanding of various detailed parameters, our technical team quickly developed a solution for the customer. Project Challenges After understanding the customer’s site and working environment, we faced the following challenges: VOITTO Solution Based on the customer’s needs and site conditions, our technical team provided a customized 10-ton double-girder gantry crane solution. The main details are as follows: 10 Ton Gantry Crane Specification After the project was confirmed, our factory arranged the order as soon as possible and started to produce the 10 ton gantry crane. The factory completed the 10-ton double-girder gantry crane as scheduled. The entire project, from design and manufacturing to delivery, took 65 days. After the equipment arrived in Brazil by sea, Voitto’s technical team provided remote guidance on installation…